Stabirail
|
monday
20 april
|
On appointment |
| On appointment | |
|
tuesday
21 april
|
On appointment |
| On appointment | |
|
wednesday
22 april
|
On appointment |
| On appointment | |
|
thursday
23 april
|
On appointment |
| On appointment | |
|
friday
24 april
|
On appointment |
| On appointment | |
|
saturday
25 april
|
Closed |
|
sunday
19 april
|
Closed |
Any information incorrect? Please let us know!
| Closed on friday 1 may 2026 for Labour Day |
| Closed on thursday 14 may 2026 for Ascension Day |
| Doornpark 10
, 9120 Beveren map |
|
|---|---|
| Phone: | +32 485 55 27 75 |
| E-mail: | info@stabirail.com |
| Website: | stabirail.com |
Stabirail has designed and developed a new method for ballastless track or slab track construction in tunnels and railway stations. Our ground-breaking system has proven to be the most efficient method for laying ballastless railway tracks in concrete beds. Furthermore our new slab track or ballastless track construction method guarantees higher accuracy, longer design life and lower whole-life cost.